The  International Atomic Energy Agency (IAEA) quarterly report made available tp the public  on May 2014 

Main Developments

• Iran has implemented the six initial practical measures that it agreed with the Agency in
November 2013 in relation to the Framework for Cooperation and both parties have agreed on the next   seven practical measures to be implemented by Iran by 15 May 2014, including one measure related to  the information contained in the Annex to the Director General’s November 2011 report.

• On 24 November 2013, the E3+3 [China, France, Germany, Russia, the United Kingdom and the United States] and Iran agreed on a Joint Plan of Action (JPA). The JPA took
effect on 20 January 2014, and the Board of Governors endorsed the Agency undertaking monitoring   and verification in relation to the nuclear-related measures.

Enrichment of UF6 above 5% U-235 is no longer taking place at [Fuel Enrichment Plant (FEP) at Natanz] FEP and [Fordow Fuel Enrichment Plant] FFEP. The amount of  nuclear material that remains in the form of UF6 enriched up to 20% U-235 is 160.6 kg. A proportion   of this material is being downblended and the remainder is being converted to uranium oxide.

• Enrichment of UF6 up to 5% U-235 continues at a rate of production similar to that indicated in   the Director General’s previous report. No additional IR-2m or IR-1 centrifuges have been installed at  FEP, FFEP or [Pilot Fuel Enrichment Plant] PFEP (production area). The amount of nuclear material that remains in the form of UF6   enriched up to 5% U-235 is 7609 kg.

• An updated Design Information Questionnaire (DIQ) for the IR-40 Reactor has been provided   to the Agency. No additional major components have been installed at this reactor and there has been  no manufacture and testing of fuel for the reactor.

• Managed access has been provided to the Agency to centrifuge assembly workshops, centrifuge rotor production workshops and storage facilities….

74. While the Agency continues to verify the non-diversion of declared nuclear material at the   nuclear facilities and [locations outside facilities most of them in hospitals] LOFs declared by Iran under its Safeguards Agreement, the Agency is not in a  position to provide credible assurance about the absence of undeclared nuclear material and activities   in Iran, and therefore to conclude that all nuclear material in Iran is in peaceful activities.  75. Iran has implemented, within the specified three-month period, the six initial practical measures   contained in the Annex to the Framework for Cooperation. The Agency is analysing the information  provided by Iran and has requested additional clarifications of some of this information.

Excerpts from Implementation of the NPT Safeguards  Agreement and relevant provisions of Security Council resolutions in the  Islamic Republic of Iran : Report by the Director General, GOV/2014/10, Feb. 20, 2014

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s